My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_REPORT - C1981038
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2010-03-15_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:36 PM
Creation date
3/16/2010 8:55:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REPORT
Doc Date
3/15/2010
Doc Name
2009 Annual Reclamation Report
From
Bowie Resources, LLC
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coal seam and extending upward for a distance of 150 feet, the shaft was filled with non-combustible <br />material. The remaining portion of the shaft was filled with other available material. <br />Reclamation of the East Mine consisted of completing the demolition of permanent <br />structures located on the Old Fan Level, Office/Bathhouse Level, and crushing and <br />screening level. <br />2001 Reclamation Activities: <br />During the year 2001, the Bowie No. 1 West Mine continued to be reclaimed. At the end of <br />the 2001 reporting year, Bowie Resources Ltd. had completed approximately 80 percent of the <br />backfilling. Topsoil located on the fill outslopes was moved to a temporary storage location during <br />the backfilling process. The West Mine Ventilation Shaft was filled during this same period. <br />The Bowie East Mine reclamation during 2001 consisted of demolition and removal of <br />permanent structures. The following structures were removed; bathhouse/office, storage tanks, <br />MCC buildings, fire house, belt structures, transfer towers, shop/warehouse, tire shop, loading bin, <br />fire house, belt structure, the majority of the 2,000 ton bin, guard shack, sewage treatment plant, <br />crushing and screening plant, truck loadout, and stacking tube. <br />6
The URL can be used to link to this page
Your browser does not support the video tag.