Laserfiche WebLink
1994 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1994 calendar year. Reclamation activities conducted included seeding and mulching operations on <br />the outslopes of the West Ridge waste pile. (See location 32 on exhibit 7). This area was reseeded <br />on November 17, 1994 with a permanent grass nix (mix no. 5 less shrub species). Also the Gross- <br />Rhode stock trail at the Orchard Valley West mime was seeded with the temporary seed mix (see <br />table #6 for seed mix) immediately following construction on May 4 and 5, 1994. <br />1993 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1993 calendar year. Reclamation activities conducted included seeding and mulching operations on <br />the outslopes of the west ridge waste pile. (See location 32 on exhibit 7). Topsoil and subsoil piles <br />in the vicinity of the West Ridge waste pile which were disturbed as a result of pile reconstruction <br />activities were seeded with the temporary seed mix (seed mixture #6 (during the fall of 1993. <br />At the close of 1993 reclamation activities on the West Ridge waste pile, the total reclaimed <br />acreage on this site was approximately 2.85 acres. Of this total acreage, 0.83 acres was newly <br />revegetated in 1993. <br />Approximately 0.12 acres of additional disturbance occurred in association with a landslide <br />at the west mine portal cut during 1993. Topsoil was salvaged from an area surrounding the slide <br />crest and stockpiled near this location (refer to Exhibit 8 in this report and Map No. 8-6, Permit No. <br />C-81-038). Disturbed areas associated with this slide and the subsequent stabilization work were <br />seeded with the temporary seed mix (seed mixture #6) mulched. Table 7 of this report depicts <br />reclaimed acreages throughout the mine site has been revised to reflect 1993 activities. <br />1992 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1992 calendar year. Reclamation activities conducted included seeding and mulching operations on <br />the outslopes of the west ridge waste pile. (See location 32 on exhibit 7). Topsoil and subsoil piles <br />in the vicinity of the West Ridge waste pile which were disturbed as a result of pile reconstruction <br />activities were seeded with the temporary seed mix (seed mixture #6 (during the fall of 1992. <br />At the closed of 1992 reclamation activities on the West Ridge pile, the total reclaimed <br />acreage on this site was approximately 2.02 acres. A total of 0.63 acres was newly revegetated in <br />1992 with the remainder having been seeded in 1983. At the close of 1983 reclamation activities on <br />the West Ridge waste pile, the total reclaimed acreage on this site was approximately 2.20 acres. <br />During gob salvage and sale operations occurring in the first and second quarters of 1992, <br />approximately 0.81 acres of seeded topsoil and subsoil was stripped from the pile to allow access to <br />the gob. Table 7 of this report depicting reclaimed acreages throughout the mine site has been <br />revised to reflect this sequence of events. <br />1991 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1991 calendar year. Reclamation activities conducted were primarily confined to interim <br />stabilization seeding and mulching operations on topsoil piles and subsoil piles in the vicinity of the <br />West Ridge waste pile (See exhibit 7). Soil storage piles in this area saw additions of materials due <br />to the topsoil and subsoil stripping operations required to access gob for sale and shipment. Topsoil <br />a