My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-11_PERMIT FILE - M2010007
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010007
>
2010-03-11_PERMIT FILE - M2010007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:10 PM
Creation date
3/15/2010 10:16:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010007
IBM Index Class Name
PERMIT FILE
Doc Date
3/11/2010
Doc Name
Preliminary adequacy review
From
DRMS
To
Steve Baker
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Please address the requirements of this subsection. Note requirements requested <br />for 6.3.2(c). <br />(m) Please address the requirements of this subsection. <br />(n) Is addressed under Items G and H of the submitted application in this section. <br />(o) No incidental products are identified. <br />(p) Please address the requirements of this subsection. <br />6.3.4 - Exhibit D. Reclamation Plan <br />General Issues: <br />• Please clarify what is referred to for submitted section D) N/A? <br />• Please clarify what Phase 1- 30 acres means as this is a 110c for 9.99 acres. <br />(1), (a) Is adequate. <br />(b) Slopes will be backfilled to 2:1 during mining and reclaimed to 3:1 for final grade. <br />(c) (i) Topsoil will be replaced at the rate of 6 to 10 inches. <br />(ii) Final reclamation will occur when site is mined. <br />(iii) Seed and shrub mix are noted as well as cottonwood and willows. <br />(iv) Please clarify how the soils will be prepped and seed applied. <br />(v) Please clarify if mulching will be required. <br />(vi) Please clarify how many cottonwoods and willows will be planted per acre. <br />(d) Please address the requirements of this subsection. <br />(e) Please address the requirements of this subsection. <br />Information for a cost estimate is noted DRMS staff will calculate a reclamation <br />liability estimate as a final step prior to a decision. <br />Please refer to Rule 3.1.Reclamation Standards: <br />3.1.1: Post mine land use is established as wildlife habitat. <br />3.1.2: is not applicable. <br />3.1.3: Full reclamation will occur after deposit is mined. <br />3.1.4: is not applicable. <br />3.1.5: Materials Handling: <br />(1) is adequate. <br />(2) is adequate. <br />(3) is adequate. <br />(4) is adequate. <br />(5) not applicable <br />(6) not applicable <br />(7) is adequate. <br />(8) not applicable <br />(9) No importation of backfill materials is proposed. <br />(10) Is being addressed within the mine plan. <br />(11) Is being addressed within the mine plan. <br />Rule 3.1.6 water-general requirements <br />Mine Plan and other permit requirements show the applicant is addressing the general <br />requirements.
The URL can be used to link to this page
Your browser does not support the video tag.