My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-12_REPORT - C1981019 (7)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2010-03-12_REPORT - C1981019 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:18 PM
Creation date
3/15/2010 9:40:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REPORT
Doc Date
3/12/2010
Doc Name
2009 Annual Hydrology & Annual Reclamation Report TOC to Section 8
From
Colowyo Coal Company
To
DRMS
Annual Report Year
2009
Permit Index Doc Type
Hydrology Report
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />• <br />Colowyo Coal Company <br />2009 Annual Reclamation and Hydrology Report <br />Figure 7-4 - East Taylor Fill Quarterly Inspection Report <br />INSPECTION REPORT - EAST TAYLOR FILL <br />INDICATE QUARTER -* 1sT ® 2ND 3RD 4TH 2009 <br />YEAR <br />MALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted In the survey monuments on the fin? <br />No NIA Yes <br />If yes, explain: <br />Date of Survey: 3125/2009 <br />Reviewed By. Tom Peterson <br />r? <br />LJ <br />2) Has any significant change been noted in the water level found in the fin monitoring <br />wen? <br />No N/A Yes Measured Level <br />If yes, explain: <br />Date of Measurement: 3/25/2009 <br />Measured By. T. Peterson <br />?. 3) Has there been any evidence of surficlal slope failure on the face of the fill? <br />No No final fill face established Yes <br />if yes, explain: <br />Date of P.E. Inspection: 3/25/2009 <br />Inspected By. T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of Inspection: 3/25/2009 <br />Inspected By. T. Peterson <br />Per ; J-I <br />O =• <br />Signed: e? = 32257 t z <br />Date: 2 f' O so........ <br />? <br />???i.. S/ONA4 'i SOP <br />Reference Permit - Volume 13, Exhibit 21, Item 1, Introductory Pages <br />CF: HSEQ 24.20.04 Revised Feb. 7, 2008 <br /> <br />Page 7-18
The URL can be used to link to this page
Your browser does not support the video tag.