Laserfiche WebLink
Colowyo Coal Company <br />2009 Annual Reclamation and Hydrology Report <br /> <br />Figure 7-1- West Pit Fill Quarterly Inspection Reports Continued <br />INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER -? 1sT 2ND 3RD 4TH ® 2009 <br />YEAR <br />*AU QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 10/07/2009 <br />Reviewed By: Jerry Macias & Tom Peterson <br />2) Has any significant change been noted in the water level found In the fill monitoring <br />well? <br />No X_ Yes Measured Level 74.50 ft. <br />If yes, explain: <br />Date of Measurement: 10/20/2009 <br />Measured By: T..Peterson <br />• <br />3) Has there been any evidence of surficial slope failure on the face of the tilt? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 10/20/2009 <br />Inspected By: T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 10/20/2009 <br />Inspected By: T. Peterson <br />O .. C. Pf?f•..tPQ <br />92257 ??y({{ <br />:'00 <br />i. lnWAI b°..O <br />Reference Permit - Volume 5-B, Exhibit 19, Page I a-4 <br />CF: HSEQ 24.20 Revised March 7. 2006 <br />Page 7-6