Laserfiche WebLink
Colowyo Coal Company <br />2009 Annual Reclamation and Hydrology Report <br />s <br />Figure 7-1- West Pit Fill Quarterly Inspection Reports Continued <br />INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER -a 1sT ? 2ND ® 3RD ? 4TH ? 2009 <br />YEAR <br />*ALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 6118/2009 <br />Reviewed By: Jerry Magas & Tom Peterson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 72.40 ft. <br />If yes, explain: <br />Date of Measurement: 6/19/2009 <br />Measured By:. T. Peterson <br />• <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 6/19/2009 <br />Inspected By-. T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 6/19/2009 <br />Inspected By: T. Peterson <br />?F'Pjo L Ic.15% <br />o•?fyg••?'Pfi 'yam t <br />`?' v S3+ ?=tea <br />7 32257 <br />'T s/MAI <br />Reference Permit - Volume 5-13, Exhibit 19, Page I a4 <br />CF: HSEQ 24.20 Revised March 7, 2008 <br />E <br />Page 7-4