Laserfiche WebLink
Colowyo Coal Company <br />2009 Annual Reclamation and Hydrology Report <br />Figure 3-1- Completed CDRMS Annual Reclamation Report Form <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year .2102 <br />C'-I SI-b19 2--f. <br />min ame permit # rmiltee <br />Address: Fi-71N I Sine- 4 In h In YI U I?)- YYMP_PkeC O) R I Gdl1 <br />This report, required by Rule 2.04.13, Is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />Identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total <br />Acres disturbed + 10, 9o <br />- 415L,rola <br />Acres backfilled and graded + 'n. b <br />- 1'3 5a, 77U <br />Acres to soiled Ito &9'.'v4 1-+52, 04 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each catecorv below. Do not Include acres that have achieved final, Phase III release. <br />• <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ar Total r less ears f <br />Acres seeded" I (" 11'.9 61 + _ - F) A. (p + <br />"Include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 4 51),? and the total number of acres: <br />Phase 1 released M-ss Phase II released $g-4#$S Phase III released 0_ <br />For Mines In Permanent Cessation: <br />Total acreage In facilities subject to reclamation but yet to be completed 4Q <br />For Government Performance and Results Act <br />Acreage In long-term mining or reclamation facilities z `I?ir?oZ <br />Acreage In active mining areas sa` n! lD , I n <br />I(exdude acres where Phase III release has been achieved) <br />' Includes haul and access roads; temporary dams and tmpoundmentr, permanent dams and Impoundments; diversion and <br />collector ditches, water and air monttming altos; topsoil stoftllea; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors: nonbacldilled and <br />graded areas of refuse piles, coal mine waste Impoundments, head-cf hollow Olls, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />' Includes plle, topsoll stripped areas In advance of pits, and spoil not ba&flffed and graded <br />Page 3-2