Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : X02 <br />Date : 0310812010 <br />User : JDM <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado Permit/job# :X-2010-231-01 <br />County : Routt Abbreviation :none <br />Site :Sage Creek Filename :X-01-X02 <br />Agency or organization name : CDRMS <br />Permit or other job action : Sage Creek Project <br />Task description :Regrade Drill Pads and Mud Pits <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br /> Blade type : Straight <br /> Attachment no. 1 : ROPS Cab Shift basis : -I per day <br /> Attachment no. 2:3-shank ripper <br /> .Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $32.98 NA <br /> Operating cost/hour : $43.48 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $115.00 Total fleet cost/hour : $115.00 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,445 LCY factor : NA volume : 5,445 LCY <br /> <br />Source of estimate d volume: Division Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth - Loam Adjusted unit production : 219.03 LCY/hr <br /> Adjusted fleet production : 219.03 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 24.86 Hours <br />Unit cost : $0.525 /LCY Total job cost : $2,859 <br />