My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_PERMIT FILE - X201023101
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201023101
>
2010-03-15_PERMIT FILE - X201023101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:35 PM
Creation date
3/15/2010 8:18:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201023101
IBM Index Class Name
PERMIT FILE
Doc Date
3/15/2010
Doc Name
Completeness/Adequacy Letter
From
DRMS
To
Twentymile Coal Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $10.23 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $10.23 NA NA $4.71 $8.86 $5.81 $7.84 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.53 $0.57 $0.88 $0.71 NA NA NA NA <br />Annual usage : $16.81 $9.04 $7.13 NA NA NA NA NA NA NA NA <br />Double shifts : $12.61 $4.52 $3.57 NA NA NA NA NA NA NA NA <br />Triple shifts : $11.21 $3.01 $2.38 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.75 NA $3.39 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.31 NA $0.51 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $15.87 $3.35 $0.00 $1.42 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.14 $0.00 $0.59 <br /> <br />ADJUSTED COST SUBTOTALS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS <br />Single shifts:, $16.81 $9.04 $7.13 $2.75 $8.86 $139 $7.84 $15.87 $3.35 $0.00 $1.42 <br />Double shifts : $12.61 $4.52 $3.57 ttachment no. 2: <br />Triple shifts : $11.21 $3.01 $2.38 $0.31 $0.57 $0.51 $0.71 $0.00 $0.14 $0.00 $0.59 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.6591o 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (-70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br /> <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin <br />Machine g and Overhaul <br />Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $32.98 $43.48 $2.83 $38.54 $117.83 <br />Double shifts : $20.69 $43.48 $2.83 $38.69 $105.70 <br />Triple shifts : $16.60 $43.48 $2.83 $38.79 $101.70 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D6R LGP - 6S (2003) 185 NA 22.6 17.9 10.3 10.4 diesel NA <br />Blade : Straight NA NA 4.0 NA 13.1 4.0 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 1.8 3.3 6.6 1.6 NA Parallelogram <br />Total weight :1 28.4 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.