Laserfiche WebLink
ADJUSTED COSTS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires sheet 2 of 2 <br /> <br />G.E.C. <br />Acquisition cost : $3.55 NA NA NA NA NA NA NA NA NA NA <br />Economic life-Truck + Attach. No. 1 : $3.55 NA NA $0.99 $0.72 $2.35 $1.21 NA NA NA NA <br />- Attachment no. 2. NA NA NA NA NA NA NA NA NA NA NA <br />Annual usage : $5.36 $1.60 $1.36 NA NA NA NA NA NA NA NA <br />Double shifts : $4.02 $0.80 $0.68 NA NA NA NA NA NA NA NA <br />Triple shifts : $3.57 $0.53 $0.45 NA NA NA NA NA NA NA NA <br />Mechanic labor-Truck + Attach. No.1 : NA NA NA $0.60 NA $1.41 NA NA NA NA NA <br />- Attachment No. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Fuel/lube - Truck + Attach. No. 1 : NA NA NA NA NA NA NA $8.25 $1.21 $0.49 $0.00 <br />-Attachment No. 2 : NA NA NA NA NA NA NA NA NA NA NA <br /> <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires <br /> <br />G.E.C. <br />Truck and Attachments 1 and 2 : ruck and Attachment no. 1 <br />Single shifts : $5.36 $1.60 $1.36 $0.60 $0.72 $1.41 $1.21 $8.25 $1.21 $0.49 $0.00 <br />Double shifts : $4.02 $0.80 $0.68 ttachment no. 2: <br />Triple shifts : $3.57 $0.53 $0.45 NA NA NA NA NA NA NA NA <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.6591o 6.20% 14.48% ($/hr) Shift Differential Colorado labor zone : 2 <br />Tanker Driver - 1 rear axle $22.97 $9.22 $1.76 $1.42 $3.33 $38.70 Day : $0.00 Two shift per day average : $0.15 <br />NA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Shift : $0.30 three shift per day average : $0.25 <br />Truck Mechanic $16.74 $4.20 $1.28 $1.04 $2.42 $25.68 Night : $0.45 <br /> <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $8.32 $13.89 NA $38.70 $60.90 <br />Double shifts : $5.50 $13.89 NA $38.85 $58.23 <br />Triple shifts : $4.56 $13.89 NA $38.95 $57.40 <br /> <br />EQUIPMENT SPECIFICATIONS <br />Machine description : Water Tanker, 2,500 Gal. Rated Operating Operating Shipping Operating Tanker <br />Operating weight Operating weight GVW payload length width width height capacity <br />(UST) (MT) (lbs) (UST) (ft.) (ft.) (ft.) (ft.) (gal) <br />Machine : 5.25 4.76 31,340 10.42 18.00 8.00 8.00 10.00 2500.00 <br />Attachment no. 1 : NA NA NA NA NA NA <br />Attachment no. 2 : NA <br />Max. speed <br />Travel speeds (mph) <br />Transmission gear: list 2nd 3rd 4th 5th 6th 7th (mph) Horsepower Fuel <br /> <br />(fhp) type <br />forward : <br />t <br />_ NA NA NA NA NA NA NA <br />_ <br />reverse : <br />I NA NA NA NA NA NA NA NA 150 Diesel