My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_PERMIT FILE - X201023101
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201023101
>
2010-03-15_PERMIT FILE - X201023101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:35 PM
Creation date
3/15/2010 8:18:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201023101
IBM Index Class Name
PERMIT FILE
Doc Date
3/15/2010
Doc Name
Completeness/Adequacy Letter
From
DRMS
To
Twentymile Coal Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $18.63 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $16.98 NA NA $13.56 $7.14 $28.90 $12.01 NA NA NA NA <br />-Attachment No. 2 : $1.65 NA NA $0.32 $0.17 $1.50 $0.66 NA NA NA NA <br />Annual usage : $34.21 $10.10 $12.12 NA NA NA NA NA NA NA NA <br />Double shifts : $25.65 $5.05 $6.06 NA NA NA NA NA NA NA NA <br />Triple shifts : $22.82 $3.36 $4.04 NA NA NA NA NA NA NA NA <br />Mech. Ibr: Machine and Attach. No. 1: NA NA NA $8.06 NA $17.17 NA NA NA NA NA <br />-Attachment No. 2 : NA NA NA $0.19 NA $0.89 NA NA NA NA NA <br />Fuel/lube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $64.61 $8.68 $1.20 $0.00 <br />Attachment No. 2 : NA NA NA NA NA NA NA $2.53 $0.36 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $3411 $10.10 $12.12 $8.06 $7.14 $17.17 $12.01 $64.61 $8.68 $1.20 $0.00 <br />Double shifts : $25.65 $5.05 $6.06 ttachment: <br />Triple shifts : $22.82 $3.36 $4.04 $0719 $0.17 $0.89 $0.66 $2.53 $0.36 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 12.60% ($/hr) Shift Differential Colorado labor zone : 2 <br />Driller - Rotary, Churn or Cable T. $16.74 $4.41 $1.28 $1.04 $2.11 $25.58 Day : $0.00 Two shift per day average : $0.15 <br />Laborer- General Air Tool $12.44 $3.53 $0.95 $0.77 $1.57 $19.26 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $2.11 $25.37 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $56.43 $118.87 $4.80 $44.84 $224.93 <br />Double shifts : $36.77 $118.87 $4.80 $45.14 $205.57 <br />Triple shifts : $30.21 $118.87 $4.80 $45.34 $199.22 <br /> <br />EQUIPMENT PERFORMANCE DATA <br />Description Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft) Width <br />(ft) Height <br />(ft) Min. turning <br />circle (ft) Horsepower <br />(fhp) Fuel <br />type <br />REEDRILL SKSAD, 7.0 in. Truck mtd. rotary blasthole NA NA 26.25 NA NA NA NA NA 430.00 Diesel <br />Clear water pump station, 225 psi Clear water pump service NA NA 0.25 NA NA NA NA NA 24.00 Diesel <br />Mud service pump station, 225 psi Mud pump service station NA NA 1.00 NA NA NA NA NA 19.90 Diesel <br />Travel speeds (mph): 1st (or max. 2nd 3rd 4th 5th 6th 7th 8th minimum dump Max. dump <br />Forward : NA NA NA NA NA NA NA NA clearance (ft.) height (ft.) <br />Reverse : NA NA NA NA NA NA NA NA NA NA <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (lbs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />NA NA NA NA NA NA NA NA NA NA NA NA
The URL can be used to link to this page
Your browser does not support the video tag.