My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-11_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-03-11_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:13 PM
Creation date
3/12/2010 7:52:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
3/11/2010
Doc Name
Preliminary Adequacy Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR81
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
analyses shall be performed in accordance with 2.05.3(6)(b), (c) and (d) to determine the <br />size of the rock toe buttresses and keyway cuts". Paragraph (10) contains no language <br />that would limit these requirements to "final" slopes. Since the temporary fill outslope <br />proposed for the East Taylor valley fill is 2.5h: Iv, which is steeper than 2.8h: Iv, <br />please address the keyway cut/rock toe buttress requirements of Rule 4.09.1(10), <br />revising the October 2009 study and permit documents as appropriate. <br />25. A bedrock buttress is depicted at the southeastern toe of Section D-D' in the October <br />2009 Shannon and Wilson Study and on Map 45. The mass was incorporated into the <br />stability analysis for this section, but no dimensions are presented on the height, slope, <br />and length of this structure. Please modify the October 2009 Shannon and Wilson <br />Study to include the design details, and modify the plan and D-D' cross-sectional <br />views of Map 45 to include the location and dimensions of the bedrock toe buttress. <br />Rule 4.14 - Backfilling and Grading <br />26. With the approval of Permit Revision 02, the Division approved a variance from AOC for <br />steep slope mining for the South Taylor Pit. This variance allowed a decrease in the <br />elevation of the backfilled areas as well as a decrease in the slopes of the associated <br />backfilled areas. The overall post-mining topography kept the pre-mining watershed <br />boundaries intact. With the submittal of TR-81, Colowyo has proposed to increase the <br />amount of permanent, out-of-pit spoil by approximately 10 million cubic yards AND <br />decrease the swell factor. This will lead to a further overall decrease in the post-mining <br />topography of the South Taylor Pit by more than six feet, on average, over the entire pit <br />area of approximately 960 acres. Rule 4.14.2(d) states that "(b)ox cut spoil or initial cut <br />spoil may not be permanently disposed of outside of the mined area unless the applicant <br />demonstrates that such material is not required to achieve approximate original contour of <br />the area in accordance with Rule 4.09.1" (emphasis added). While the Division did <br />approve the currently approved permanent, out-of-pit spoil piles in PR-02, with TR-81 <br />Colowyo is requesting the Division to approve a further variance (decrease) in AOC, <br />although such a variance is not specifically requested in the revision. Based on the <br />Division's review of the currently approved Map 19B - Post-Mining Topography-South <br />Taylor Area and the proposed Map 19B, there do not appear to be any changes to the <br />post-mining topography in the South Taylor Pit. The only changes noted on the proposed <br />Map 19B are to the East and West Taylor Fills. Pursuant to Rule 4.09.2(d), please <br />provide the Division with documentation and justification why the additional 10 <br />million cubic yards of material proposed for the South Taylor Fills will not be <br />needed to meet AOC. The Division cannot make a finding to approve further <br />decreasing the final topography of the South Taylor Pit by an average of five feet <br />(up to 17 feet with the change in swell), over the entire pit area while approving an <br />increase in the volumes of the East and West Taylor permanent fills. <br />27. In question 3 the Division details the decrease.in the amount of available spoil material <br />due to the decrease in the swell factor from 20% to 15%. Since a majority of the South <br />Taylor Operation will be a truck/shovel operation, this decrease will be amplified as <br />mining progresses from the box-cut area to the east. The Division believes that this
The URL can be used to link to this page
Your browser does not support the video tag.