Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2010 Monthly Report <br />Page 3 <br />Table 2 -February 2010 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water Total Depth (ft) Volume of <br /> feet Water ft <br />P12 2/26/10 41.70 41.71 0.01 <br />P13 2/26/10 40.96 41.34 0.38 <br />P14 2/26/10 Dry 41.24 0.00 <br />P15 2/26/10 D 41.10 0.00 <br />Table 3 below provides the calendar year 2010 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />October 209 <br />0 s <br />E Transferred Pond #3 sludge to drying pad. <br />February2010 117tons Transferred sludge from drying pad to <br />tailings im undment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bible (303) 324-2630. <br />F. Madrid <br />Coordinator III <br />Cc: Bill Lyle <br />File