Laserfiche WebLink
03/02/2010 15:27 9702401201 DMEA STAKING PAGE 02/02 <br />?I <br />A Touchstone EneW!Cooperative <br />March x, 2010 <br />United Companies <br />Attn: Jana Sanders <br />225 N 5th Street, Suite 8 <br />Grand Junction, CO 81501 <br />pearJana, <br />As per your request dated 2/17/10, DMEA I reby grants permission to excavate gravel in the area of <br />our 115KV transmission line located north c LaSalle Rd. This grant will he allowed based on the <br />following conditions: (1) DMEA vehicular ac :ss to the line must he maintained at all times, (2) there will <br />be no excavation within 50 feet of the line. ised on these two conditions DMEA can see no negative <br />effect on our existing 115KV transmission li % with regards to United's mining operation. <br />Sincerely, <br />r? <br />Denton B. Watkins <br />Staking-Cngineer Supervisor