Electrically Conductive Fracture Test Borehole Abandonment Plan <br />At the time of site reclamation, or when the Electrofrac electrically conductive <br />fracture construction test boreholes are no longer necessary, they will be plugged <br />and abandoned. The abandonment plan is to cement the full length of the <br />borehole and any accessible connected fracture system with type G cement. <br />After cementing, the borehole will be capped. The estimated total abandonment <br />cost is $5,000.00 per borehole. ExxonMobil currently envisions no more than six <br />boreholes will required for a total abandonment cost of $30,000.00. <br />Schematic Diagram for Typical Electrofrac Construction Test