Laserfiche WebLink
OCT-16-08 THU 01:42 PM FAX NO. P. 03 <br />UMC to operate the mill for Calais and mill only Cross Mine ore. Calais 100% <br />controls the mill and mill operation. This is not a custom milling operation. <br />s Calais will file the SOO, TR and performance bond obligations. Calais, through <br />precedence, will hold both the Cross Mine 110(2) permit and the mill 110 permit <br />concurrently. <br />Additionally, we wish to discuss resolving the outstanding permit issues with <br />regards to the ADEN, tailings pond, storm water plan, and water supply. <br />We request a meeting as soon as possible. Approximately 10 days have lapsed as we <br />have traded phone calls and messages. Time is truly of the essence. We stand ready to <br />meet with you in person or via telephone conferencing if you so desire. <br />Thank you for your prompt attention to this matter. I can be reached at 303-638-2573 or <br />mclder a unionmilling.com or imecomike@gmail.com. <br />Sincerely, <br /> <br />J. Michael Elder <br />Environmental Compliance <br />Cc: N. Michael - UMC <br />1). Young -- Calais