My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-10_REVISION - P2008043
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008043
>
2010-03-10_REVISION - P2008043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:02 AM
Creation date
3/11/2010 7:31:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
3/10/2010
Doc Name
Responses to Third Review
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
MD3
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />POWERTECh (USA) INC. <br />?,6, ? <br />RICHARD E. BLUBAUGH <br />Vice President - Health <br />Safety & Environment Resources <br />NOW CONFI Ni AL <br />March 9, 2010 <br />Allen C. Sorenson <br />Reclamation Specialist <br />?n Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Powertech Responses to Third Review of Notice of Intent Modification MD-03, File <br />No. P-2008-043, Centennial Project, Weld County, Colorado <br />Dear Mr. Sorenson: <br />Please find included the Powertech (USA) Inc. (Powertech) responses to the Division of <br />Reclamation, Mining and Safety (DRMS) comments contained in its Third Review of Notice of <br />Intent (NOI) File Number P-2008-043 MD-03, dated March 4, 2010. <br />DRMS Comment #1: <br />Powertech's October 28, 2009 submittal states "All cleaning and inspection procedures <br />outlined in the Powertech Produced Water Vessel Cleaning and Inspection Procedure will be <br />adhered to and will be certified as complete before water containment vessels are brought on the <br />site. All manifolds, valves, and transfer pumps will be cleaned as described in the attached <br />procedure. Additionally piping will be new and National Sanitation Foundation or otherwise <br />certified for potable water" <br />Provide a commitment to provision to DRMS of the certifications described in the preceding <br />statement and a commitment that the tanks will not be used to store produced groundwater until <br />after the certifications have been accepted by DRMS in writing. <br />Powertech Response to DRMS Comment #1: <br />Powertech commits to provide to the DRMS the certifications described in its Comment #1. <br />Powertech will not begin storing produced groundwater within the water containment vessels <br />until after certifications outlined in the Powertech Produced Water Vessel Cleaning and <br />Inspection Procedure have been accepted by the DRMS in writing. <br />DRMS Comment #2: <br />RECEIVW <br />MAR 10 2010 ',-' <br />5575 DTC Parkway, Suite 140 Telephone: 303-790-7528 <br />Greenwood Village, CO 80111 USA Facsimile: 303-790-3885 <br />Website: www.powertechuranium.c Ot KeClblftt t*n- <br />Email: info@powertechuranium.com Kffft Wd
The URL can be used to link to this page
Your browser does not support the video tag.