Laserfiche WebLink
(Page 4) <br />' 3. The Pickenpaugh Gravel Pit has not been issued a stormwater discharge permit to allow for 4/ 1 /10 <br />the discharge of stormwater from the site. Rule 3.1.6 (1) (b) requires Operators to minimize <br />disturbances to the prevailing hydrologic balance through compliance with applicable <br />federal and Colorado water quality laws and regulations, including statewide water <br />quality standards. <br />PB or PV: PR <br />TOPIC(S): AR <br />Corrective actions are to: The Operator shall obtain a stormwater discharge permit from the - <br />Colorado Department of Public Health and Environment-Water Quality Control Division. A <br />copy of the stormwater discharge permit shall be submitted to the Division on or before April <br />1, 2010. <br />11