Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID #: _M-1285-109 <br />INSPECTION DATE: 9.? 1 A-41n INSPECTOR=S INITIALS: MAC' <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Mining at the Arthur L Schmeiser pit has been complete for over five years and the 9/18/11 <br />Operator has failed to complete reclamation at the site. Rule 3.1.3 states that all <br />reclamation shall be carried to completion within five years from the date the Operator <br />informs the Division that mining is complete. <br />PB or PV: PB_ <br />TOPIC(S): AR <br />Corrective actions are to: The Operator shall reclaim the site on or before February 18, 2011. <br />The Operator shall notify the Division upon completion of reclamation and shall request an <br />inspection of the site. The Division will conduct an inspection to confirm that reclamation has <br />been completed.