My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-08_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2010-03-08_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:55 PM
Creation date
3/8/2010 11:26:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
3/8/2010
Doc Name
2009 Annual Hydrology Report Part 2
From
Bowie Resources, LLC
To
DRMS
Annual Report Year
2009
Permit Index Doc Type
Hydrology Report
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />• 2009 Annual Hydrology Report <br />Static Water Level <br />Water Elevation <br />• F '. <br />Phosphate <br />ResidueFilterable <br />Sulfate <br />Arsenic <br />Cadmium <br />Calcium <br />Iron (Dissolved) <br />Iron (Total) <br />Magnesium <br />Manganese (Diss <br />Manganese (Tots <br />Mercu <br />Selenium <br />Sodium <br />DH -38 <br />D Gulch - Drill Hole <br />Elevation - 7245.1 <br />Depth - 454' <br />Ground Water <br />su 1 7.11 7.11 7.1 <br />umhos /cm 1 7411 7411 741 <br />Celsius 1 18.41 18.41 18.4 <br />NITS <br />Hole alignment has caused bailer to become lodged. <br />Drill Hole 38 is located on D Gulch along the south facing slopes. It is accessed by foot from an old drill road leading to Drill Hole 16. This hole <br />has an alignment problem that prevents the retrieval of sample water by the use of a bailer. Water level only is measured at this point. <br />Baseline Information for Point DH-38 is derived from events beginning on 10/30/83 through 6/16/98. <br />Point influenced by mining on 6/16/98. <br />Figure No. 138 <br />Initiated <br />10130/1983 <br />10/30/1983 <br />10/30/1983 <br />10/30/1983 <br />Activated <br />6/16/1998 <br />6/16/1998 <br />6/16/1998 <br />6/16/1998 <br />Date <br />M 11/24/2009 <br />9/29/2009 <br />7/1/2009 <br />3/5/2009 <br />Summary Information <br />Baseline Operation <br />UNITS Min Ave Max Min <br />Ave Max <br />Feet 438.78 448.05 454.00 445Z4 <br />490.00 <br />453.98 <br />453.871 <br />453.611 <br />452.94 <br />Feet 6791.116797.116806.316755.116791.316799. <br />791.12 <br />6791.231 <br />6791.491 <br />6792.16 <br />Thick Mud <br />su 1 7.11 7.11 7.1 <br />umhos /cm 1 7411 7411 741 <br />Celsius 1 18.41 18.41 18.4 <br />NITS <br />Hole alignment has caused bailer to become lodged. <br />Drill Hole 38 is located on D Gulch along the south facing slopes. It is accessed by foot from an old drill road leading to Drill Hole 16. This hole <br />has an alignment problem that prevents the retrieval of sample water by the use of a bailer. Water level only is measured at this point. <br />Baseline Information for Point DH-38 is derived from events beginning on 10/30/83 through 6/16/98. <br />Point influenced by mining on 6/16/98. <br />Figure No. 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.