Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />. 2009 Annual Hydrology Report C -1 <br />North Fork - Drainage System <br />Elevation - 5910 <br />Initiated 6/29/2000 6/29/2000 6/29/2000 6/29/2000 <br />Activated <br />Date 10/26/2009 8/27/2009 7/8/2009 5/17/2009 <br />Summary Information <br />• <br />The C -1 monitoring point is a Culvert under the Union Pacific Railroad. It is located 40 feet northeast of the Terror Creek Loadout <br />mainline switch. <br />• <br />Baseline Information Collection initiated on 6/29/00 and not yet considered complete. <br />Point C -1 has not been influenced by mining. <br />Figure No. 88 <br />The area of concern for monitoring point C -1 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />