My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-24_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:00 PM
Creation date
3/5/2010 3:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/24/2010
Doc Name
Complete Text Submittal - 2.05, Vol III Tab 1
Type & Sequence
PR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />Five rock entries were driven in the B -East mains to cross the fault in the B- <br />Seam. The entries were be supported as necessary to assure safety of the <br />miners and to assure any debris within the fault plane is supported in place <br />and not allowed to cave or flow into the mine. <br />Mining advanced through the fault in the D -Seam and longwall panels WD1, <br />WD2 and WD3 were mined with no significant problems. Longwell mining <br />faces will be developed about 850 feet wide and will vary in length from 2800 <br />to 6200 feet. Gates entries will typically be developed with three entries with <br />pillar spacing and size designed to provide maximum support for ventilation <br />and belt haulage. Bleeder entries will be developed with four or more <br />entries. <br />The new unit train loadout is located south of the UPRR mainline. The <br />Terror Creek Loadout and its associated activities are located north of the <br />UPRR mainline. Therefore, the Operator and the Terror Creek Loadout will <br />not have overlapping permit areas. <br />Mining is currently ongoing in the B -Seam. Panel B-8 is being mined. <br />Development for panel B -9 is complete. Mining in the B -8 and B -9 panels <br />has encountered higherthan normal methane concentrations. The Operator <br />is having difficultly dealing with the methane in the sealed areas and in the <br />longwall gob areas. Beginning late in 2009, nitrogen will be generated on the <br />surface a piped down the Hubbard Creek Shaft through the D -Seam <br />dewatering pipeline. Nitrogen will be piped to and injected into problem <br />areas in orderto dilute methane concentrations. The nitrogen generatorwill <br />run intermittently as required to supply necessary nitrogen to the mine. <br />The extent of mining in the B-8 and B -9 panels has been substantially <br />reduced because of adverse mining conditions. Panels B -10 and B -11 will <br />not be developed in the eastern mining district. Reduced coal recovery in <br />northeast mining district results in all resources being moved to the <br />remaining coal reserves located to the west. The west reserves are located <br />west of Terror Creek and were previously defined as the Bowie No. 1 mine <br />east thick coal pod. These reserves were not mined from the Bowie No. 1 <br />mine because of the June 1986 mine fire. <br />• PR -12 2.05-7- 02110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.