My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-24_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:00 PM
Creation date
3/5/2010 3:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/24/2010
Doc Name
Complete Text Submittal - 2.05, Vol III Tab 1
Type & Sequence
PR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />Run -off from the material storage area located below drainage area E and <br />pond C does not go through a treatment facility such as a sediment pond. <br />The material storage area is located north of the haul road along the old rail <br />bed. Run -off from the haul road along the old rail bed does not go through a <br />treatment facility either. Run -off from these adjacent areas is controlled by <br />berms and ditches. A berm along the south side of the area contains <br />drainage to the ditch on the north side of the material storage area. <br />Run -off from the material storage area and haul road is directed to ditch D- <br />E1. Sediment traps will be installed in ditch D -E1 as shown on Map 21 -1. <br />The sediment traps will be straw bales, silt fences or other approved devices. <br />The sediments traps will slow and remove sediment from the run -off from the <br />material storage area and haul road. The sample point for this SAE is near <br />the dewatering valve for pond C. <br />Run -off from the pump station located near the Deer Trail Ditch will not be <br />contained in a sediment pond. The pump station is located below old State <br />Highway 133 in a location where sediment pond construction would be <br />difficult. Run -off from the area disturbed by the pump station construction <br />is will be filtered through a sediment trap such as straw bales, silt fences or <br />other approved devices. The location of the sediment trap for the pump <br />house is presented on Map 21 -1. <br />The vent shaft pad located in Freeman Gulch was covered by a massive <br />slide. It is no longer monitored or maintained. Design of the sediment <br />fences was presented in Volume 111, Exhibit 8 beginning on page Exh -8 - 87. <br />Run -off from the Hubbard Creek vent shaft pad does not go through a <br />treatment facility such as a sediment pond. Run -off from this pad will be <br />filtered through a 40 -foot long sediment fence. Design of the sediment fence <br />is presented in Volume III, Exhibit 8 beginning on page Exh -8 - 209. Flow <br />will be routed to the sediment fence with ditches and berms as shown on <br />Map 39. <br />,7 <br />Run -off from the Hubbard Creek pump station does not go through a <br />treatment facility such as a sediment pond. Run -off from this pad will be <br />filtered through a 50 -foot long sediment fence. Design of the sediment fence <br />is presented in Volume III, Exhibit 8 beginning on page Exh -8 - 234. <br />PR-12 2.05-42- 2/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.