My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-24_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:00 PM
Creation date
3/5/2010 3:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/24/2010
Doc Name
Complete Text Submittal - 2.05, Vol III Tab 1
Type & Sequence
PR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2.05.3 <br />The truck traffic which will utilize this haul road segment will be 10 wheel <br />dump trucks. A 20 -foot wide, 2% center crowned, gravel surfaced road will <br />be adequate for these haul trucks. Vehicle traffic should have no problem <br />with this road configuration. There are no road segments that exceed 10% <br />grade. <br />The gob haul trucks may track gob material onto Bowie Road and this road <br />segment. The operator will utilize a water truck to clean Bowie Road and this <br />road segment as necessary. The wash down water will be directed to the <br />road ditches which will convey the water to Ponds B and J. A skid steer <br />loader will be used to clean up any small spills. The bridge over the Fire <br />Mountain Canal has solid steel plates on the running surface. Solid steel <br />plates are located on each side of the bridge. These plates will assure that <br />no gob material gets into the Fire Mountain Canal from trucks crossing the <br />bridge. <br />Design and Construction <br />For the construction of this road segment, all vegetation material and topsoil <br />will be removed from the design road bed, shoulders, and surfaces where <br />associated structures will be placed. Topsoil will be placed in one of the <br />topsoil stockpiles located on site. No vegetation material or topsoil will be <br />placed beneath or in any haul road embankment. <br />The embankment specification presented above applies to this road <br />segment. <br />Acid- or toxic - forming substances will not be used in the haul road surfacing <br />or embankment. <br />Temporary erosion control measures will be implemented during the <br />construction of the haul road. Silt fences or other alternative sedimentation <br />control devices will be placed along the edge of the embankments. After <br />construction is complete the area disturbed will be seeded and mulched to <br />reduce the rate and volume of run -off. <br />Drainage <br />The discussion of drainage presented above under the discussion of the <br />main haul road is applicable to this road segment. <br />Reclamation of this haul road will involve returning the road to its pre- mining <br />contours. The road will be returned to its relative flat configuration as shown <br />on Map 18 Post Mining Topography. <br />PR -12 2.05-32- 02/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.