My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-24_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:00 PM
Creation date
3/5/2010 3:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/24/2010
Doc Name
Complete Text Submittal - 2.05, Vol III Tab 1
Type & Sequence
PR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Reclamation of this haul road will involve returning the road to its pre- mining <br />contours. The road will be returned to its relative flat configuration as shown <br />on Map 18 Post Mining Topography. The material from the wash plant <br />excavation that was used to construct this road segment will be returned to <br />the wash plant site to bring the site back to approximate original contours. <br />3) Haul Road for gob pile access. <br />A discussion of the haul road for the gob pile access is presented in Volume <br />IV, Coal Mine Waste Bank Final Design for the Bowie No. 2 Mine, prepared <br />by W ESTEC. <br />4) Haul Road to B -Seam Portals <br />General Requirements <br />This road segment is approximately 400 feet long. Reference Map 16, Haul <br />Road Plan & Profile - Gob Pile. This road provides access to the B -Seam <br />portals. Drainage from this road is contained in sediment ponds. <br />Dust control on this road segment includes gravel surfacing and watering to <br />maintain surface moisture. <br />The truck traffic which will utilize this haul road segment will be 10 and 18 <br />wheel haul trucks. A 30 -foot wide road surface should be adequate for these <br />haul trucks. Vehicle traffic should have no problem with this road <br />configuration. The maximum pitch grade form this road is 10 %. <br />Design and Construction <br />For the construction of this road segment, all vegetation material and topsoil <br />will be removed from the design road bed, shoulders, and surfaces where <br />associated structures will be placed. Topsoil will be placed in one of the <br />topsoil stockpiles located on site. No vegetation material or topsoil will be <br />placed beneath or in any haul road embankment. <br />The embankment specification presented above applies to this road <br />segment. <br />PR -12 2.05-30- 02/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.