My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-24_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:00 PM
Creation date
3/5/2010 3:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/24/2010
Doc Name
Complete Text Submittal - 2.05, Vol III Tab 1
Type & Sequence
PR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1* 2.05.3 <br />Thickener <br />The thickener is a concrete structure where water is cleaned and returned to <br />the wash plant. The tank is approximately 70 feet in diameter and 10 feet <br />high. The reinforced concrete walls and floor are approximately 10 inches <br />thick. <br />Refuse Bin <br />The refuse bin will be utilized to hold surges in refuse production from the <br />wash plant and will load refuse haul trucks. The refuse bin is constructed of <br />structural steel and is approximately 20 feet by 20 feet by 60 feet high. <br />Transfer Buildings <br />Two transfer buildings are associated with the wash plant. One transfers the <br />plant feed and the other transfers clean coal. Both are constructed of <br />structural steel and are 16 feet by 16 feet in plan view. The plant feed <br />transfer building is 32 feet high. The clean coal transfer building is 16 feet <br />high. <br />Loadout Transfer Building <br />The loadout transfer building is a structural steel building where the reclaim <br />belt terminates. The coal transfers to the loadout conveyor. The dimensions <br />of the building are approximately 20 feet by 20 feet by 45 feet high. <br />Loadout Structure - Batch Weigh System <br />The loadout structure is a structural steel building where the loadout <br />conveyor terminates. The coal is batch weighed and loaded into rail cars at <br />this location. The dimensions of the building are approximately 30 feet by 40 <br />feet by 120 feet high. <br />Railroad Track <br />Unit trains will approach the loadout from the west and switch off the <br />mainline to the south and enter the lead track. The lead track is <br />approximately 8240 -feet long. There is also a parallel storage track that is <br />3,570 feet long. Approximately 2800 -feet of mainline track was relocated to <br />facilitate construction of the loadout. <br />Pipe Under Gob Pile No. 3 <br />A temporary 6 -inch diameter pipe located under gob pile number 3 to convey <br />0 pond discharge water to an undisturbed drainage. The permanent plan is to <br />PR -12 <br />2.05-19- 02/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.