Laserfiche WebLink
0 <br />• <br />(4) East and West Clean Water Ditch Verification, J.T. <br />Paluso, P.E. <br />(5) Safety Factor Analysis for Sediment Pond, J.T. <br />Paluso, P.E. <br />(6) Sediment Pond Certification by Fleming Engineering, <br />Inc., <br />- Sediment Pond "As Built" and Runoff Control <br />Structures. Verification for Drainawes; Basin A and <br />Basin B, EIS Environmental & Engineering Consulting. <br />- Retention Pond (sic) Compaction Test Results, Trautner <br />Geotechnical Services. <br />Reclamation Bond Estimate 12 <br />1 Prepared b GCC Energy, LLC <br />(2) Prepared by Colorado Division of Reclamation, <br />Mining & Safe <br />GCC Energy, LLC King II Mine <br />• Table of Contents <br />Page iii March, 2010