3/1/2010 <br />ANNUAL REPORT <br />EVERHART PIT <br />Permit No. M-1997-081 <br />35,000 tons of material was crushed in the pit in 2009 however the material was added to <br />the existing stockpile of crushed material. The "waste" pile was depleted by the owner <br />who had use for that material so that stockpile remained substantially constant. <br />As stated in previous reports we use the material on an as-needed basis. Crushing is done <br />under contract and usually lasts about 2 weeks in duration. The contractor is tasked with <br />the maintenance of the pit during crushing including adherence to our stormwater <br />management plant requirements. A project manager monitors the crushing operation and <br />during extraction there is a foreman or team leader on the site to supervise removal of <br />material and to ensure proper safety procedures. <br />I have included a new map that shows minor modifications due to the removal of material <br />from the mine face. <br />Please note that this permit is held by Pueblo County therefore no financial warranty has <br />been required.