Laserfiche WebLink
Rule 3.0 - Performance Bond Requirements <br />1. The currently approved mining and reclamation plan must be used as the <br />beginning cost basis. Colowyo has based the revised cost estimate on <br />proposed changes to the mining and reclamation plans in TR-81, which is <br />currently under review. A revised cost estimate will be reviewed at a later <br />date based on what may be approved with that revision. <br />2. Technical Revision 85 is a consolidation of the two current reclamation cost <br />estimates contained in the Colowyo Permit (Exhibit 13, which covers the main <br />mine area, facilities area and Gossard Loadout and Exhibit 13A, which covers the <br />South Taylor mining and facilities area). Section 3.0 of the Colowyo permit <br />(Volume 1) contains chronological information regarding the updates to the <br />reclamation cost estimate. The text also contains information regarding the <br />permit maps related to the reclamation cost estimate. Colowyo has not included <br />any updated permit Volume 1, Section 3.0 text with the submittal of TR-85. <br />Please submit two copies of the updated permit Volume 1, Section 3.0 text for <br />the Division's review. Please update the chronology of the reclamation cost <br />estimate updates and update the information for the maps related to the <br />reclamation cost estimate that are referenced in this section. <br />3. In addition to question 2 above, Section 3.0 of the South Taylor area permit <br />(Volume 12) contains text and map references for the reclamation cost estimate <br />for the South Taylor Pit. Colowyo has not provided any updated permit Volume <br />12, Section 3.0 text with the submittal of TR-85. Please submit two copies of <br />the updated permit Volume 12, Section 3.0 text for the Division's review. <br />Please update the chronology of the reclamation cost estimate updates and <br />update the information for the maps related to the reclamation cost estimate <br />that are referenced in this section. <br />4. With the submittal of TR-85, Colowyo has deleted and consolidated several maps <br />from the original Colowyo permit (Volumes 1-11). The deleted maps include <br />Maps 34, 35 and 36 (replaced with Maps 34A, 35A and 36A, respectively). <br />Additionally, Colowyo is eliminating Exhibit 13, which was the original Colowyo <br />cost estimate, and including this estimate with Exhibit 13A, which was the <br />estimate for the South Taylor Pit. Colowyo has not updated the Table of Contents <br />to reflect these changes and deletions. Please submit two copies of the Table of <br />Contents for the original Colowyo Permit (Volumes 1-11) for the Division's <br />Review. <br />5. With the submittal of TR-85, Colowyo has deleted and consolidated several maps <br />from the South Taylor permit (Volumes 12-14). The deleted map is Map 40A and <br />the consolidated maps are Maps 34A, 35A, 36A and 39. Colowyo has not <br />updated the Table of Contents to reflect these changes and deletions. Please