My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-01_REPORT - C1981018
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2010-03-01_REPORT - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:16 PM
Creation date
3/2/2010 8:56:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REPORT
Doc Date
3/1/2010
Doc Name
2009 AHR Review
From
DRMS
To
Blue Mountain Energy, Inc
Annual Report Year
2009
Permit Index Doc Type
Hydrology Report
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. PHC: Groundwater inflow into the mine will be very low. <br />Mining in the B Seam encountered only small flows of water and the mine is essentially dry. <br />Typical inflows are in the order of 1 to 8 gpm with occasional short term increases when <br />localized perched water tables are encountered. <br />3. PHC: The construction of surface facilities associated with the mine will result in <br />temporary increases in the suspended solids concentration of the adjacent and receiving <br />stream. <br />The temporary increase predicted in the PHC section of the Deserado Mine permit would have <br />most likely occurred during construction of the facilities area. Although the prediction no <br />longer applies, the effect of sedimentation ponds on the site is to reduce TSS to levels lower <br />than they would be during a storm event. Discharge Monitoring Reports during the 2009 water <br />year showed consistently low suspended solids. <br />4. PHC: Mine inflows are predicted not to exceed 5 to 10 gpm. <br />Incidental leakage into the mine site includes leakage from water lines, dust control, and wash- <br />down water. The 2009 AHR lists 6.81 gpm mine inflow from the incidental water. <br />5. PHC: Very little water will be pumped to the surface from the underground mine. <br />No water has been pumped from the underground workings since January 10, 1996. During the <br />1996-1997 periods, Deserado Mine began disposing of the prep plant thickener water in the <br />mined out area of the D-seam. <br />6. PHC: The local groundwater table may be lowered as mining proceeds. <br />The 2009 AHR showed a decline in piezometric level in wells in close proximity to mine <br />workings. Five monitoring wells have turned dry as a result of being mined through. Two <br />monitoring wells showed a rise in water levels from the 2008-2009 water year and ten <br />monitoring wells showed a decrease in the water table, with well 22-3M showing no change. <br />7. PHC: The effects of subsidence in Red Wash and in Scullion Gulch will be shot-lived. <br />As projected, subsidence in Red Wash initially resulted in water ponding in the stream bottom. <br />The high content of silt and clay carried by Red Wash rapidly filled the ponds. The silt and <br />clay layers have sealed any cracks that formed in the alluvium as the result of subsidence. The <br />2009 AHR reports that no surface hydrologic consequences were observed due to subsidence. <br />8. Refuse disposal effects on surface and groundwater systems is expected to be minimal. <br />The 2009 AHR included no data on this prediction. There was no discharge of surface water <br />from ponds RP-1, RP-2/3/4, and RP-5 treating run-off from the waste piles. Seeps and springs <br />are absent in the refuse disposal area and the entire site receives low precipitation. Overall, the
The URL can be used to link to this page
Your browser does not support the video tag.