Laserfiche WebLink
Ms. Sira Sartori <br />February 24, 2010 <br />Page 7 <br />18. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any pending water <br />court case or any other legal action that may be initiated concerning this plan. This decision <br />shall not bind the state engineer to act in a similar manner in any other applications involving <br />other plans, or in any proposed renewal of this plan, and shall not imply concurrence with any <br />findings of fact or conclusions of law contained herein, or with the.engineering methodologies <br />used by the Applicant. <br />If you have any questions concerning this approval, please contact loana Comaniciu in <br />Denver at (303) 866-3581 or Dave Nettles in Greeley at (970) 352-8712. <br />Sincerely, <br />k') <br />Jeff Deatherage, P.E. <br />Water Resource Engineer <br />Attachments: Tables 1, 3, & 5 <br />Affidavit-Dedication of 5.75 shares of the Taylor and Gill Ditch to this SWSP <br />Platte River Power Authority Lease <br />Tri-District Lease <br />Cc: Dave Nettles, Assistant Division Engineer (810 9th Street, 2nd Floor, Greeley, Colorado <br />80631, 970-352-8712) <br />George Varra, Water Commissioner, Water District 3 (1400 Highway 287 North, Ft. Collins, <br />Colorado 80524, 970-484-1628) <br />Division of Reclamation Mining and Safety <br />JD/IDC/ 09-10/Combined Plan (Home Office-M77-439, North Taft Hill Expansion Site-M02-081 and Overland Ponds <br />Site-M01-051)