My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_HYDROLOGY - M2002120
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2002120
>
2010-02-24_HYDROLOGY - M2002120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:59 PM
Creation date
3/2/2010 7:33:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
HYDROLOGY
Doc Date
2/24/2010
Doc Name
Substitute Water Supply Plan
From
OSE
To
Civil Resources, LLC
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Table 1 <br />Bernhardt Pit <br />Evaporative and Operational Losses <br /> Percent of Gross Average Effective Net Net Water Surface <br />Month Annual Evaporation Precipitation Precipitation Evaporation Evaporation for <br /> Evaporation 6.23 <br /> (inches) (inches) (inches) <br />- (inches) (acre-feel) <br /> [1j [2] fat [4] 151 (6] <br />January 3.0% 1.32 0.40 0.28 1.03 0.54 <br />February 3.5% 1.53 0.39 0.28 1.26 0.65 <br />March 5.5% 2.41 1.10 0.77 1.65 0.85 <br />April 9.0% 3.95 1.60 1.12 2.82 1.47 <br />May 12.0% 5.26 2.51 1.76 3.50 1.82 <br />June 14.5% 6.36 1.68 1.18 5.18 2.69 <br />July 15.0% 6.58 1.11 0.77 5.80 3.01 <br />August 13.5% 5.92 1.24 0.87 5.05 2.62 <br />September 10.0% 4.39 1.24 0.87 3.51 1.82 <br />October 7.0% 3.07 0.85 0.59 2.48 1.29 <br />November 4.0% 1.75 0.68 0.47 1.28 0.67 <br />December 3.0% 1.32 0.47 0.33 0.99 0.51 <br />Total 100.0% 43.86 13.27 9.29 34.57 17.94 <br /> Percent of Amount of Water Lost Percent of Amount of Water Used^ Water Used Total <br />Month Annual Aggregate With Mined Annual Concrete in Concrete for Dust Evaporative <br /> Aggregate Production Aggregate & Concrete Production Batching Control' & Operational <br /> Production Production Losses <br /> (tons) (acre-feet) (cubic yards) .(acre-feet) (acre-feet)- (acre-feet) <br />) <br /> [7) [8] 191 [ 01 [1l] (12 <br />1 [13] [14] <br /> <br />January 0.0% 0 0.00 0.0% 0 0.00 0.00 0.54 <br />February - 0.0% 0 0.00 0.0% 0 0.00 0.00 0.65 <br />March 0.0% 0 0.00 5.5% 550 0.07 0.37 1.29 <br />April 10.4% 0 0.00 9.0% 900 0.11 0.37 1.95 <br />May 14.4% 0 0.00 13.0% 1,300 0.16 0.37 2.35 <br />June 17.9% 0 0.00 16.5% 1,650 0.20 0.37 3.26 <br />July 19.4% 0 0.00 18.0% 1,800 0.22 0.37 3.60 <br />August 16.4% 0 0.00 15.0% 1,500 0.18 0.37 3.17 <br />September 12.4% 0 0.00 11.0% 1,100 0.14 0.37 2.33 <br />October 9.4% 0 0.00 8.0% 800 0.10 0.37 1.76 <br />November 0.0% 0 0.00 4.0% 400 0.05 0.37 1.09 <br />December 0.0% 0 0.00 0.0% 0 0.00 0.00 0.51 <br />Total 100.0% 0 0.00 100.0% 10,000 1.23 3.33 22.50 <br />Notes: <br />[l] From SB 120, the evaporation percentages are for gravel pits with elevations below 6,500 feet. <br />(2] Equals Percent of Annual Evaporation times 29.05 inches. ' <br />[3) From Colorado Slate University's Colorado Climate Center web page, htiptl/eoc.atmos.celoslate.edu for Longmont Weather Station. <br />[4] Equals Column (3) times 70 percent 70 percent value was taken from SB 120. <br />[5] Equals Column (2) minus Column (4). If the resultant value is less than zero then a zero is substituted. <br />[6] Equals Column (5) divided by 12 times 11.11 acres. Includes Pond 1(4.97 ac), Pond 2 (5.43 ac), Processing pond (0,40 ac) and dewatering trench (0.31 ac). <br />M Based on intonation from Hall-Irwin. <br />[E] Equals Column (7) times 400,000 tons per year. Production based on information from Hall-Irwin. This is production from the 22 acres mining operation. <br />[9] Equals Column (2) times 2000 limes 4% divided by 62.4 divided by 43,560. <br />(10] Based on information from Hall-Irwin. <br />till Equals Column (10) times 100,000 cy per year. Production based on information from Hall-Irwin. <br />[12] Equals Column (11) times 40 gallons divided by 325851. Assume a use of 40 gallons per cubic yard of concrete production. <br />[f3] Equals 6000 gallons per day times number of operating days (20 days) In the month divided by 325a51, during production months (March thm November). <br />[14j Equals Column (6) plus Column (9). <br />BERN_SWSP2010.xis Civil Resources, LLC, 12/5/2009
The URL can be used to link to this page
Your browser does not support the video tag.