Laserfiche WebLink
i ?al <br />Greg Lewic%ki And Associates <br />11541 Warrington Cou4thone: (303) 346-5196 Fax (303)-346-4 <br />Parker, CO USA 801419iMai1:greg@1ewicki.biz <br />February 16, 2010 <br />Dave Bird <br />Colorado Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street 2nd Floor <br />Denver, CO 80203-2273 <br />Re : Annual Report Alma Placer, M-1985-029 <br />Dear Dave: <br />Enclosed is the Annual Report for the past year for Alma Placer Mine, including map and <br />report form. Past records show that the annual date for the pit is February 22nd of each <br />year. During the past year, the permit was transferred to the new operator, Alma Placer <br />Company, LLC. The new financial warranty for the permit, which was recently raised, is <br />now $188,679 and the total permit area is 216.10 acres. <br />The following information is provided to comply with C.R.S 34-32.5-116 or C.R.S 34-32- <br />116: <br />(1) No new areas have been disturbed in the past 12 months. The gravel operator has <br />extracted gravel from the same disturbed area as has been in use for the past few years. <br />Mining has been accomplished by extracting deeper gravel. The power poles that were in <br />the gravel mining area have been relocated and the area has been smoothed out. <br />The gravel operator has installed settling ponds as shown from which silt is being <br />excavated and stockpiled. The silt stockpile area for the gravel operator is shown on the <br />Annual Report Map as the 2006 Stockpile area. <br />The gold operator has also operated within the same disturbance area as in the past few <br />years. Material for the operation has been obtained by processing gravel that was <br />previously disturbed on the surface. The ponds immediately below the gold processing <br />plant are frequently cleaned out to remove sediment, and this silty material is then <br />stockpiled for later use in reclamation as substitute topsoil. The location of the stockpile <br />area is shown on the attached Annual Report Map. In 2009, mining continued in Phase 1 <br />and Phase 2. See the Annual Report Map. Some of the processed material from the gold <br />operation is also being sold as construction aggregates, but the amount sold does not result