My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981010 (57)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
_INSPECTION - C1981010 (57)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 5:34:10 PM
Creation date
3/1/2010 10:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
2/25/2010
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial OSM Special Topic coal inspection conducted by Jason Musick of the Colorado <br /> Division of Reclamation, Mining, and Safety(Division) on 25 February 2010. The weather was cloudy <br /> and snowing during the inspection of the site. Duane Matt of OSM and Graham Roberts of TMI <br /> accompanied the inspection. <br /> This was an OSM special focus inspection for AOC compliance. During this inspection, a comparison <br /> was made of the pre and post mining topography maps, M-3 and M12, before conducting the on the <br /> ground inspection. <br /> Backfilling and Grading <br /> The inspection was focused in the areas of backfilled and graded sections F-AB-08, F-AB-07, and F- <br /> AB-06. Utilizing the Trimble GeoXT, -20-30 points were taken to determine the elevation of the final <br /> backfilled areas. Duane Matt of OSM used the same locations to take the same number of points. <br /> This method of determining AOC was also conducted to help determine Phase on Bond release, SL- <br /> 08. The ground was snow covered with -2-4 feet of snow throughout the area. No problems were <br /> noted during the inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.