Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial OSM Special Topic coal inspection conducted by Jason Musick of the Colorado <br /> Division of Reclamation, Mining, and Safety(Division) on 25 February 2010. The weather was cloudy <br /> and snowing during the inspection of the site. Duane Matt of OSM and Graham Roberts of TMI <br /> accompanied the inspection. <br /> This was an OSM special focus inspection for AOC compliance. During this inspection, a comparison <br /> was made of the pre and post mining topography maps, M-3 and M12, before conducting the on the <br /> ground inspection. <br /> Backfilling and Grading <br /> The inspection was focused in the areas of backfilled and graded sections F-AB-08, F-AB-07, and F- <br /> AB-06. Utilizing the Trimble GeoXT, -20-30 points were taken to determine the elevation of the final <br /> backfilled areas. Duane Matt of OSM used the same locations to take the same number of points. <br /> This method of determining AOC was also conducted to help determine Phase on Bond release, SL- <br /> 08. The ground was snow covered with -2-4 feet of snow throughout the area. No problems were <br /> noted during the inspection. <br />