My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-28_PERMIT FILE - C1996083A (14)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-12-28_PERMIT FILE - C1996083A (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:08 PM
Creation date
2/26/2010 9:34:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/28/2009
Doc Name
Volume IX TOC and Information
Section_Exhibit Name
Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 Construction <br />The total disturbed area of the coal mine waste disposal operation (Gob Pile No. 2) is <br />approximately 50 acres, including the required, stockpiles, borrow areas and <br />sedimentation controls. Gob Pile No. 4 added another 5 acres of disturbance. The <br />capacity of the refuse disposal site (Gob Pile No. 2) is approximately 2,000,000 cubic <br />yards. The maximum height between the toe of the proposed fill and its ultimate top is <br />approximately two hundred and forty feet. The capacity of Gob Pile No. 4 is <br />approximately 450,000 cubic yards. The maximum height between the toe of the <br />proposed fill and its ultimate top is approximately one hundred and fifty feet. <br />The first task of the construction of the coal mine waste disposal area was the <br />construction of the sedimentation pond and associated collection and diversion ditches. <br />The second task was the stripping of topsoil, removal of all organic material and <br />salvaging cover material. The third task was the installation of the lateral drains, rock <br />under - drains and excavation of the toe key into competent material as per the <br />recommendation of the Lambert & Associates report dated November 10, 2003. <br />The soil material exposed in the clearing and grubbing operations was compacted prior <br />• to material being placed. <br />The first 50 -foot lift, which encompassed the lower 7.5 acres of waste disposal site was <br />initially cleared of trees and heavy brush. The footprint of the topsoil and coverfill <br />stockpiles was also cleared of trees and heavy brush. The trees and heavy brush were <br />stockpiled and burned. After the site was cleared of trees and heavy brush, topsoil, <br />organic material and vegetation (including sagebrush) was stripped together and <br />stockpiled in the topsoil storage area. Approximately 50,000 cubic yards of topsoil was <br />salvaged for the entire extent of the pile. Coverf ill was salvaged and stockpiled in the <br />designated area. Approximately 28,000 cubic yards were salvaged and stockpiled. <br />Gob pile number 4 was constructed on the borrow area approved by technical revision <br />number 43. The site was initially cleared of trees and heavy brush. After the site was <br />cleared, organic material and vegetation was stripped and stockpiled in the topsoil <br />storage area. Approximately 6,900 cubic yards of topsoil and nearly 180,000 cubic yards <br />of coverfill material were salvaged. <br />• <br />TR -64 -4- 09/09 <br />/�zg�0 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.