Laserfiche WebLink
0 <br />I ^ 1 <br />• <br />Appendix A <br />Coal Mine Waste Disposal Area <br />Salvage Volumes <br />Area <br />*Topsoil <br />Topsoil <br />Acres <br />Depth Ft. <br />CY <br />Coverfill Pile <br />2.3 <br />1.2 <br />4,453 <br />Initial 50 Foot Bench <br />3.9 <br />1.2 <br />7,550 <br />Second 50 Foot Bench <br />7.7 <br />1.2 <br />14,907 <br />Third 50 Foot Bench <br />5.8 <br />1.2 <br />11,229 <br />Fourth 50 Foot Bench <br />2.9 <br />1.2 <br />5,614 <br />Top of Pile <br />2.3 <br />1.2 <br />4,453 <br />N 3SI <br />Gob Pile #4 <br />7.4 <br />0.58 <br />6,924 <br />Gob Pile #1 <br />2.7 <br />0.5 <br />2,178 <br />Totals <br />35.00 <br />57,309 <br />Reclamation Volumes <br />Area <br />Topsoil <br />Topsoil <br />From <br />Cover (Regd) <br />Acres <br />Depth Ft. <br />CY <br />Stockpile <br />CY <br />Initial 50 Foot Bench <br />3.9 <br />0.9 <br />5,663 <br />5,663 <br />19,505 <br />Second 50 Foot Bench <br />5.1 <br />0.9 <br />7,347 <br />7,347 <br />25,307 <br />Third 50 Foot Bench <br />5.2 <br />0.9 <br />7,594 <br />7,594 <br />26,157 <br />Fourth 50 Foot Bench <br />5.1 <br />0.9 <br />7,420 <br />7,420 <br />25,557 <br />Top of Pile <br />6.8 <br />0.9 <br />9,917 <br />9,917 <br />34,159 <br />Coverfill Pile <br />2.3 <br />0.9 <br />3,340 <br />3,340 <br />n/a <br />Gob Pile # 4 <br />10.1 <br />0.9 <br />14,665 <br />14,665 <br />50,513 <br />Gob Pile #1 <br />1.1 <br />0.9 <br />1,597 <br />1,597 <br />5,501 <br />Totals <br />39.63 <br />54,203 <br />186,700 <br />SURVCAD Calculated Volumes <br />In- Place; <br />Volume Salvaged <br />CY <br />COVERFILL PILE <br />28,432 <br />TOPSOIL PILES <br />50,326 <br />BORROW AREA <br />179,281 <br />BORROW AREA TOPSOIL <br />6,900 <br />NOTES: <br />* UNIFORM TOPSOIL DEPTH ASSUMED IN <br />ORDER TO MATCH QUANTITY CALCULATED <br />TR -64 App. A 09/09 <br />I'Zjz S�fl 9 <br />