Laserfiche WebLink
~~ .............................................................Figure 3.1 <br />Gob Pile Sediment Pond (Pond D) was redesigned as part of <br />TR-43. Upland runoff areas for Pond D are shown on Map <br />20 in Volume II. The upland runoff areas shown on Figure <br />4.1 in this Volume are no longer valid. <br /> <br />~~ <br />TR-43 Volume IV- Fig 3.1 08/06 <br />AOP~zovEo <br />9 ~!I/ob <br />