My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-28_PERMIT FILE - C1996083A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-12-28_PERMIT FILE - C1996083A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:08 PM
Creation date
2/26/2010 9:33:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/28/2009
Doc Name
pg 2.05-1 to 2.05-58i
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1 <br />�J <br />2.05.3 <br />Thickener <br />The thickener is a concrete structure where water is cleaned and returned to the <br />wash plant. The tank is approximately 70 feet in diameter and 10 feet high. The <br />reinforced concrete walls and floor are approximately 10 inches thick. <br />Refuse Bin <br />The refuse bin will be utilized to hold surges in refuse production from the wash <br />plant and will load refuse haul trucks. The refuse bin is constructed of structural <br />steel and is approximately 20 feet by 20 feet by 60 feet high. <br />Transfer Buildings <br />_Two transfer_ibuilding are. associated with the wash plant. One-transfers the plant - - <br />feed and the other transfers clean coal. Both are constructed of structural steel and <br />are 16 feet by 16 feet in plan view. The plant feed transfer building is 32 feet high. <br />The clean coal transfer building is 16 feet high. <br />Loadout Transfer Building <br />The loadout transfer building is a structural steel building where the reclaim belt <br />terminates. The coal transfers to the loadout conveyor. The dimensions of the <br />building are approximately 20 feet by 20 feet by 45 feet high. <br />• <br />Loadout Structure - Batch Weigh System <br />The loadout structure is a structural steel building where the loadout conveyor <br />terminates. The coal is batch weighed and loaded into rail cars at this location. The <br />dimensions of the building are approximately 30 feet by 40 feet by 120 feet high. <br />Railroad Track <br />Unit trains will approach the loadout from the west and switch off the mainline to the <br />south and enter the lead track. The lead track is approximately 8240 -feet long. <br />There is also:a parallel storage track that is 3,570 feet long. Approximately 2800 - <br />feet of main line track was relocated to facilitate construction of the loadout. <br />Pipe Under Gob No. 3 <br />A temporary 6 -inch diameter pipe located under gob pile number 3 to convey <br />pond discharge water to an undisturbed drainage. The permanent plan is to <br />route the pond discharge water around gob pile no. 3. The permanent plan <br />will not be implemented for many years. <br />• <br />MR -102 <br />A ROVEb <br />- 5 /2-9/09 <br />2.05-15- 05/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.