My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-25_REVISION - M1977222
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977222
>
2010-02-25_REVISION - M1977222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:26 PM
Creation date
2/25/2010 2:37:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977222
IBM Index Class Name
REVISION
Doc Date
2/25/2010
Doc Name
Request of PW and FW
From
DRMS
To
All Rite Paving and Redi Mix, Inc.
Type & Sequence
SO1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date : 0212212010 <br />User : JLE <br />State : Colorado <br />Permit/job# :M-1977-222 <br />County: Otero Abbreviation :none <br />Site : Rocky Ford South Pit Filename : M222-001 <br />volume : 93,563 LCY factor : NA volume : 93,563 LCY <br /> <br />Source of estimated volume : Estimate from 2-17-2010 Inspection <br />Source of estimated swell factor :NA <br /> <br />::::.::::: <br />HOURLY PRODUCTION ........::..: <br />Job Condition Correction Factors ::::::::..::::.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Partly consolidated stockpile Spoil pile: 0.80 (fnd-ro <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,380 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.96 <br />Weight description <br />Earth - Loam Adjusted unit production : 874.43 LCY/hr <br /> Adjusted fleet production : 1,748.86 LCY/hr <br /> <br /> <br /> <br />... <br />. AND COST: ......................................... <br />JOB TIME <br /> <br />............................... <br />................................ <br /> <br />....................................................................... <br />.............................. <br />......................................... <br /> <br />......................... <br />........................... <br /> <br />. <br />................................ <br />Fleet size : 2 Dozer(s) Total job time : 53.50 Hours <br />Unit cost : $0.231 /LCY Total job cost : $21,643
The URL can be used to link to this page
Your browser does not support the video tag.