Laserfiche WebLink
........ .:..:::::.;::..::.; ..:. . <br />:::. <br />:XXXXXXXXX <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Water Tanker, 5,000 Gal. <br />$79.87 <br />1 <br />$79.87 _ <br />$79.87 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $79.87 $79.87 <br />EUIPMENT .:::::.................................................... .............__.......................... ......................................................................................... <br />..................................................... <br />Q HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) .= 0.07 <br />Return time (hours) = 0.07 <br />Loading time (hours) = 1.00 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.63 <br />JOB TIME AND COST <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Equipment <br />0.07 <br />0.07 <br />NA <br />NA <br />0.13 <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />Total job time <br />Total job cost <br />Rocky Ford <br />miles <br />mph <br />hours