My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-25_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-02-25_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:27 PM
Creation date
2/24/2010 10:51:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
2/25/2008
Doc Name
Letter Regarding Copy of The Referenced Report
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
PR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rock Logic Consulting <br />[D Flock Logic PO Box 544 • Cedaredge, CO 81413 <br />Consulting LLC - Phone: (435) 851-9044 • rocklogicconsulting@gmail.com <br />Brad Lindsay* Consulting Geologist <br />Memorandum <br />Date: 18 February 2008 <br />To: Collin Stewart <br />Ry Stone <br />cc: Bill Bear, Roger Pihl, Richard Johnson <br />From: Brad Lindsay <br />Subject: Terror Creek Reservoir Slide Instrument Readings <br />Executive Summary <br />Inclinometers and piezometers at the Terror Creek Reservoir Slide were measured on <br />February 14, 2008. There was very little change since the previous readings in October <br />2007. Water level in piezometer #4 is higher than it was in October. The rest of the water <br />levels have remained nearly the same. Snow on the slide is four or five feet deep. <br />• Inclinometers <br />Yeah and Associates installed four inclinometers on the slide area northwest of Terror Creek <br />Reservoir in February 2006. The inclinometers have been labeled TCR-01, TCR-03, TCR- <br />05, and TCR-07. Bowie Resources LLC had previously installed two borings in the slope. <br />They were labeled BL-101A and BL-102A. Both of these borings contain a TDR cable and a <br />1" PVC with an inclinometer cable. The cable is crimped above the PVC. The distance from <br />the top of the PVC to the crimp is measured to determine movement. <br />All four TCR inclinometers were measured. Neither of the BL installations was measured. <br />Displacement graphs for the TCR inclinometers have been included with this memorandum. <br />Each graph depicts incremental displacement along the length of the inclinometer casing. <br />There are two graphs for each installation. The graph labeled A-Axis represents movement <br />in the southeast and northwest direction, down slope toward the reservoir. The other graph <br />labeled B-Axis represents movement perpendicular to the A-axis, roughly parallel with the <br />0
The URL can be used to link to this page
Your browser does not support the video tag.