Laserfiche WebLink
n <br />L_J <br />• <br />Peabody Energy Corporation: Notice of Violation List Page: 1 <br />Date: 10/28/2009 <br />For NOV's Issued Between 11/16/2006 and 10/19/2009 <br />06-051 <br />Company: <br />BLACK BEAUTY COAL COMPANY, LLC <br />Mine: <br />MILLER CREEK -KNOX PIT <br />Permit: <br />S -00222 MSHA ID: 12 -02063 <br />County: <br />KNOX State: Indiana <br />NOV: <br />N61116 -S -00222 Issued: 11/16/2006 <br />Issuer: <br />Indiana Department of Natural Resources <br />Cause: <br />FAILURE TO CONDUCT BLASTING OPERATION WITHIN MAXIMUM VIBRATION LIMITS; <br />Status: <br />TERMINATED: 11/16/06; <br />As of: <br />11/16/2006 <br />Action: <br />SUBSEQUENT BLASTING OPERATIONS WERE CONDUCTED WITHIN VIBRATION LIMITS; <br />Penalty: <br />NONE; <br />06-053 <br />Company: <br />BLACK BEAUTY COAL COMPANY, LLC <br />Mine: <br />FARMERSBURG MINE <br />Permit: <br />S -00287 MSHA ID: 12 -02174 <br />County: <br />SULLIVANNIGO State: Indiana <br />NOV: <br />N61219 -S -00287 Issued: 12/19/2006 <br />Issuer: <br />Indiana Department of Natural Resources <br />Cause: <br />FAILURE TO CONDUCT REQUIRED MONITORING AND SUBMITTALS FOR GROUNG WATER <br />MONITORING; <br />Status: <br />TERMINATED; 12/19/06; <br />As of: <br />12/19/2006 <br />Action: <br />THE OPERATOR HAS SUBMITTED THE GROUNDWATER MONITORING FOR WELL MW -1a <br />FOR THE <br />FOURTH QUARTER; <br />Penalty: <br />NONE; <br />07 -002 <br />Company: <br />ARLCLAR COMPANY, LLC <br />Mine: <br />WILDCAT HILLS /COTTAGE GROVE PIT <br />Permit: <br />376 MSHA ID: 11 -03017 <br />County: <br />State: Illinois <br />NOV: <br />31 -01 -2007 Issued: 1/11/2007 <br />Issuer: <br />Illinois Department of Mines and Minerals <br />Cause: <br />FAILURE TO REMOVE, STORE, AND PROTECT TOPSOIL MATERIALS IN ADVANCE OF <br />MINING <br />OPERATIONS; <br />Status: <br />TERMINATED: 1) 01/26/07; 2) 02/06/07; <br />As of: <br />2/6/2007 <br />Action: <br />1) RELOCATED NONCOMPLYING TOPSOIL STORAGE PILES TO APPROVED TOPSOIL <br />STOCK PILE <br />LOCATIONS; 2) SUBMITTED FOR APPROVAL A TOPSOIL STOCKPILE PLAN OUTLINING <br />COMPLYING <br />PROCESS; <br />Penalty: <br />ASSESSED $1345.00; <br />r <br />J <br />