My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-13_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2009-08-13_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:45 PM
Creation date
2/23/2010 10:10:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/13/2009
Section_Exhibit Name
Table of Contents -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 (3) Mine Facilities .................................................................................................. ..........96 <br /> 2.05.3 (4) Operation Plan -Ponds, Impoundments, and Diversions ................................ ..........97 <br /> 2.05.3 (5) Topsoil .............................................................................................................. ..........97 <br /> 2.05.3 (6) Overburden ....................................................................................................... ..........99 <br /> 2.05.3 (7) Coal Handling Structures .................................................................................. ........102 <br /> 2.05.3 (8) Coal Mine Waste and Non-Coat Processing Waste .......................................... ........]02 <br /> 2.05.3 (9) Return of Coal Mine Waste to Abandoned Workings ...................................... ........102 <br /> 2.05.4 (1) Reclamation Plan .............................................................................................. ........103 <br /> 2.05.4 (2)(a) Reclamation Timetable ..................................................................................... ........103 <br /> 2.05.4 (2)(b) Reclamation Costs ............................................................................................ ........104 <br /> 2.05.4(2)(c) BackfillingPlan ................................................................................................ ........104 <br /> 2.05.4 (2)(d) Topsoil Salvage ................................................................................................ ........104 <br /> 2.05.4 (2) (e) Reclamation Revegetation ................................................................................ ........105 <br /> 2.05.4(£ h) Disposal, Mine Openings, Water and Air Control ............................................ ........105 <br /> 2.05.5 Post-Mining Land Uses .................................................................................... ........105 <br /> 2.05.6 Mitigation of Impacts of Mining Operations .................................................... ........107 <br /> 2.05.6 (1) Air Pollution Control P1an ................................................................................ ........107 <br /> 2.05.6 (2) Fish and Wildlife Plan ...................................................................................... ........107 <br /> 2.05.6 (3)(a) Protection of the Hydrologic Balance ............................................................... ........107 <br /> 2.05.6 (3)(b)(i & ii) Hydrologic Controls ......................................................................................... ........109 <br /> 2.05.6 (3)(b)(iii) Probable Hydrologic Consequences ................................................................. ........109 <br /> 2.05.6 (4) Protection of Public Parks and Historic Places ................................................. ........121 <br /> 2.05.6 (5-6) Surface Mining neaz Underground Mining; Subsidence Control .................... ........121 <br /> 2.06 PERMIT REQUIREMENTS -SPECIAL MINING CATEGORIES .................. ........122 <br /> 2.06.1-3 Scope, Experimental Mining, and Mountain Top Removal ............................. ........122 <br />• 2.06.4 Steep Slope Mining ........................................................................................... ........122 <br /> 2.06.5 Variance from Approximate Original Contour Restoration Requirements ...... ........122 <br /> 2.06.5 (2) (a) Post-Mining Land Use ................................................................................................ ........122 <br /> 2.06.5 (2) (b) Consultation with Planning Agencies ......................................................................... ........122 <br /> 2.06.5 (2) (c) Alternative Postmining Land Uses .............................................................................. ........122 <br /> 2.06.5 (2) (d) Watershed Improvements ........................................................................................... ........123 <br /> 2.06.5 (2) (e) Owner Approval .......................................................................................................... ........123 <br /> 2.06.5 (2) (f) Compliance with Limited V aziances ........................................................................... ........123 <br /> 2.06.6 Prime Farmlands ............................................................................................... ........123 <br /> 2.06.7 Reclamation Variance ....................................................................................... ........123 <br /> 2.06.8 Alluvial Valley Floor (AVF) ............................................................................ ........125 <br /> 2.06.9 - 2.06.11 Augering, Processing Plants, In-Situ Processing .............................................. ........129 <br /> 2.06.12.1 Coal Refuse Piles .............................................................................................. ........129 <br /> 2.07 - 2.10 VARIOUS ............................................................................................................ ........129 <br /> RULE 3 -PERFORMANCE BOND ................................................................................................ ............1 <br /> RULE 4 -PERFORMANCE STANDARDS ................................................................................... ............1 <br /> 4.02 SIGNS AND MARKERS .................................................................................... ............1 <br /> 4.02.] Specifications .................................................................................................... ............1 <br /> 4.02.2 Mine and Permit Identification Signs ............................................................... ............1 <br /> 4.02.3 Perimeter Markers ............................................................................................ ............ I <br /> 4.02.4 Duration of Maintenance .................................................................................. ............1 <br /> 4.02.5 Stream Buffer Zone Markers ............................................................................ ............1 <br /> 4.02.6 Blasting Signs .................................................................................................... ...........2 <br /> 4.02.7 Topsoil Markers ................................................................................................. ...........2 <br /> 4.03 ROADWAYS ...................................................................................................... ............2 <br /> 4.03.1 Haul Roads ....................................................................................................... ............2 <br />South Taylor/Lower Wilson - ii Revision Date: 3/30/07 <br />Revision No.: PR-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.