Laserfiche WebLink
RULE 2 PERMITS <br />. Public Notice of Blasting Schedule <br />Colowyo will republish a blasting schedule similar to the one set forth in Volume 1, Section 2.05, Figure <br />1 -Public Notice of Blasting Schedule. <br />Disposal of Excess Spoil <br />Colowyo will construct two separate "valley fills" which will be called the East Taylor Fill and the West <br />Taylor Fill. These fills are necessary due to the early operation of the South Taylor mining area; <br />overburden will need to be placed into the fills so that sufficient working area can be developed prior to <br />the placement of subsequent overburden into the mined-out areas. <br />Detailed geotechnical investigations were completed for both the East Taylor Fill and the West Taylor <br />Fill by Shannon & Wilson, Inc. A report of the investigations can be found in Exhibit 21 Item 1. <br />Construction plans for the fills, addressing the requirements of Rule 4.09, Disposal of Excess Spoil, can <br />also be found in Section 4.09 and Exhibit 21, Item 1. Locations of the East Taylor Fill and West Taylor <br />Fill can be found in Exhibit 21, Item 1 and on Map 23A. <br />2.05.3 (7) Coal Handling Structures <br />Please Refer to Volume 1, Section 2.05, Coal Handling Structures. <br />2.05.3 (8) Coal Mine Waste and Non-Coal Processing Waste <br />• Not applicable. Colowyo uses dry crushing facility for coal prepazation; no coal processing waste, as <br />defined in Rule 1.04 "Definitions", is produced from any part of the mining operations. <br />2.05.3 (9) Return of Coal Mine Waste to Abandoned Workings <br />No coal processing waste or coal mine waste as defined in Rule 1.04 "Definitions" is produced from any <br />part of the Colowyo mining operations. Therefore this section is not applicable. <br /> <br />South Taylor/Lower Wilson-Rule 2, Page 102 Revision Date: 3/30/07 <br />Revision No.: PR-02 <br />