Laserfiche WebLink
RULE 4 PERFORMANCE S <br />4.03 Roads <br />The following sections deal with roads defined per Rule 1.04 (111). <br />4.03.1 Haul Roads <br />Haul roads at the Colowyo operation will be utilized and maintained to control or minimize erosion, <br />siltation, air and water pollution, and damage to public or- private property. The main haul road A for the <br />Colowyo operation is shown on the Existing Structures - North Map (Map. 21) and the Existing <br />Structures - South Map (Map 22). The main haul road A runs from the pit area (traffic crossover) to the <br />Gossard Loadout; the approximate length of this haul road is four miles. The profile for haul road A is <br />shown on the Haul Road "A" Profile (Map 25). <br />The haul road B was formerly the access road from Highway 13 to the haul road A intersection leading to <br />the Gossard Loadout. Colowyo requested a change in the road status by Technical Revision in June, 1992. <br />The status change was made necessary at the request of our customer Tri -State Generation and <br />Transmission Association, Inc. (Tri- State) and their intention to transport coal to the Craig Station by <br />truck rather than rail. The haul road B is shown on Existing Structures - North Map (Map 21) and Haul <br />Road "B" Profile (Map 25A). The approximate length of the road is 1.4 miles. <br />The roads used in the actual mining area constantly change as the operation progresses. The "in -pit" roads <br />are maintained by a motor grader and are regularly wetted to minimize dust. Any drainage off the "in -pit" <br />roads will be retained in the pit or diverted to the drainage and sediment control structures located on the <br />Hydrology - South Map (Map 12). Due to the nature of the South Taylor Pit Expansion, Colowyo will <br />construct and maintain a haul road that will be located within the Disturbance Boundary and partially <br />outside the active mining boundary. The South Taylor Haul Road's location can be found on Map 23 — <br />Mine Plan South Area with its design details being located on Map 25C — South Taylor Haul Road. <br />Please refer to Permit Volume Twelve, Section 4.03.1 — Haul Roads for text related to this haul road. <br />Reclamation of the South Taylor Haul Road to AOC will be addressed as required by Rule 4.03.1(7) and <br />will take place after Colowyo has determined that the road will no longer be needed for operations, <br />reclamation or monitoring, presumably during reclamation of the final pit area. <br />Various best management practices are utilized- to minimize air and water pollution. With the exception <br />of the new South Taylor Haul Road, which will be surfaced with rock or crushed gravel as needed, the <br />haul roads A and B have been paved with asphalt to control air and water pollution, and ditches and <br />culverts exist to control runoff. The haul road A and B outslopes are vegetated to control sediment. <br />Portions of the haulroad A are located in the vicinity of segments of Taylor creek that are deeply incised, <br />eroded and unstable. Rock lined energy dissipators are employed to reduce erosion on these -steep banks. <br />Protected ditch runouts to the natural drainage are employed to reduce erosion. Small dugouts are <br />employed as sediment traps. Vegetated areas are utilized as sediment filters. The haul road A is under <br />constant routine maintenance to avoid damage to environmental values. <br />The construction of the haul road segments A and B was completed in 1977. The design for the haul <br />roads had been prepared based on the anticipated volume of traffic and the weight and speed of vehicles <br />to be used. The Colowyo Coal haulage fleet used for transport of coal from the primary crusher to the <br />Gossard Loadout consists of highway trucks. <br />The haul roads are located on stable terrain to minimize erosion. As shown on the Existing Structures - <br />North Map (Map 21), the haul road A crosses Taylor Creek, and has been maintained according to the <br />requirements of 4.03.1(4). The grade and pitch requirements specified in 4.03.1(3), Design and <br />Construction, are met for both haul roads. <br />Rule 4 Performance Standards 4.03 -1 Revision Date: 7/27/09 <br />Revision No.: TR -76 <br />