Laserfiche WebLink
Demolition Work <br />Pro ec Identification <br />Page 1 of 1 <br /> Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />Task #: aaa Permit/job#: C-80-007 <br />Date: 212212010 Abbreviation: N/A <br />User: TAK Site: West Elk Mine Filename: <br />Permitting action: MR-362 Source of unit costs: CIRCES <br />Task description: Demolish and remove all structures related to the Emergency Back-up Generator 1 Location adjustment: 99.50% <br /> Last unit cost update: 2009 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAB. TOTAL <br /> ft ft ft If in (100% LIAB) (ACTUAL) <br />Emergency Back-up Generator (MR-362) <br />Concrete pad for 2250 kw generator 78 15 18 1,170 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $4,059.90 100% $4,059.90 <br />Steel housing for 2250 kw generator 31 10.5 12.3 3,987 CF Demo/disp./exc. pit - 200' push $0.23 $929.06 100% $929.06 <br />Steel fuel tanks for 2250 kw generator 34 10.67 4.8 1 EA Haul to cert. Dump- 9K-12K gal. $1,050.00 $1,050.00 100% $1,050.00 <br />Steel housing for transformer/control unit 40 8 10 3,040 CF Demo/disp./exc. pit - 200' push $0.23 $708.32 100% $708.32 <br />Concrete pad for 50 kw generator 11 4 12 44 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $152.68 100% $152.68 <br />Fuel tanks for 50 kw generator 10.8 3.33 6.75 1 EA Haul to cert. Dump- 3K-5K gal. $660.00 $660.00 100% $660.00 <br />Total for this page before location adjustment $7,559.96 <br />Location adjustment: 99.50% Total for this page after location adjustment $7,522.16 <br />Grand total for this task after location adjustment $7,522.16