My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_INSPECTION - M1980183
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980183
>
2010-02-22_INSPECTION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
2/23/2010 7:20:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
INSPECTION
Doc Date
2/22/2010
Doc Name
Insp Rpt
From
DRMS
To
Brannan Sand & Gravel Company
Inspection Date
2/5/2010
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #: M-1980-183 <br />INSPECTION DATE: 05 FPhniarv 2010 INSPECTOR'S INITIALS: _ R2_ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION DATE <br />1. The existence of a slurry wall surrounding the site, without a means of conveying groundwater <br />around the site, such as a French Drain, increases the potential for disturbances to the prevailing <br />hydrologic balance. Disturbances to the prevailing hydrologic balance of the affected land <br />would constitute a violation of 434-32.5-116(4)(h) CRS of the Act, and Rule 3.1.6(1) of the <br />Construction Materials Rules & Regulations. However, there is no plan in place that provides <br />adequate monitoring of ground water levels around the site. <br />Corrective Action: Submit a Technical Revision that contains a ground water level monitoring an <br />as described on page 2 of this inspection report. The TR will be due on 23 April 2010. <br />2 <br />04/,23/ 2010 <br />PB or PV: PB <br />TOPIC(S): FIB <br /> <br />PB or PV: <br />TOPIC(S):
The URL can be used to link to this page
Your browser does not support the video tag.