My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-16_PERMIT FILE - M2008012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008012
>
2010-02-16_PERMIT FILE - M2008012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:36 PM
Creation date
2/23/2010 7:19:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008012
IBM Index Class Name
PERMIT FILE
Doc Date
2/16/2010
Doc Name
Conversion Application for 112d Permit
From
BCI Engineers & Scientists, Inc.
To
Nuvemco
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L - RECLAMATION COSTS <br />Table L-1. Estimated Reclamation Costs <br />Area Description Disturbed Area(acres) Estimated Reclamation Costs <br />Waste Rock Dump 0.30 Included in future dump <br />Future Waste Rock Dump 0.68 $5,000 <br />Ore Stockpile and Loading Area <br />- Over excavate one foot of <br />material and lace in mine <br />0.10 <br />$9,000 <br />Sediment Pond North 0.01 $500 <br />Sediment Pond South 0.01 $500 <br />To Soil Stockpile 0.04 $500 <br />Future Soil Stockpile 0.07 $500 <br />General Facilities Area 1.4 $8,000 <br />Mine Access Road 0.2 $500 <br />Trail to Vent 1 0.16 $500 <br />Trail to Vent 2 0.09 $500 <br />3 potential new vents and trails 0.28 $2,000 <br />Drilling Phase 1* 2.5 $11,700 <br />Drilling Phase 2 1.2 $4,700* <br />Drilling Phase 3 1.2 $4,800* <br />Reclaim Portal 0.1 $2,100 <br />Total 8.04 $41,300 <br />*Note that drilling will be done in phases and no more than 50 boreholes will be un-reclaimed at <br />any time. Phases 2 and 3 are not included in the total because Phase 1 will be at least partially <br />reclaimed prior to beginning Phases 2 or 3. Final reclamation may not be determined until after <br />three years and growth has been documented, but each hole will be sealed, backfilled and surface <br />reseeded shortly after drilling. <br />Last Chance Mine - April 2009 <br />L - l