Laserfiche WebLink
0 0 <br />BOWIE RESOURCES - BOWIE NO. 1 MINE The Subsidence Monitoring Point PL#3 is located 2,125 feet from recent mining. This point is within <br />SUBSIDENCE MONITORING DATA - 2009 the angle of draw of the Bowie No. 1 Mine workings and was most recently affected by workings <br />described as Entries in 1996, more than 12 years ago. <br />STATION : PL#3 ROOF BOLT <br />n <br />DATE NORTHING EASTING ELEVATION -DOWN/+UP <br />12/27/2006 17332.46 10662.65 7560.59 0.06 <br />7/12/2007 17332.47 10662.66 7560.61 0.02 <br />12/18/2007 17332.49 10662.65 7560.60 -0.01 <br />6/24/2008 17332.48 10662.64 7560.67 0.07 <br />12/2/2008 17332.45 10662.64 7560.57 -0.10 <br />5/27/2009 17332.48 10662.65 7560.59 0.02 <br />12/3/2009 17332.44 10662.64 7560.54 -0.05 <br /> <br />MAXIMUM 17333.79 10662.70 7561.19 0.78 <br />MINIMUM 17332.42 10660.44 7560.12 -0.58 <br />MOVEMENT 1.37 2.26 0.12