Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DE OOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 09a State :Colorado Permit/job # :M-1994-097 <br />Date : 0211612010 County :Montrose Abbreviation :none <br />User : GRM Site :Spring Creek Pit Filename :M097-09a <br />Permit or other job action :Final Reclamation Liabilty Estimate Am-03 <br />Task description :secondary seeding mobilization <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />icapacities : <br />? 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : hip cost/hour : $16.63 $18.37 $22.33 <br />g <br />tjn <br />cost/hour : $44.38 $46.13 $50.07 <br />tor cost/hour $27.66 $27.66 $27.66 <br />per cost/ hour : $0.00 $25.39 $25.39 <br />Total Unit CosUhour : $88.67 $117.55 $125.45 <br />NUN-KUAUAt3Lr- r-WU%rrviru <br />Machine <br />Description v I <br />Weightlunit <br />(Tons) <br />Ownership <br />Cost/hr/unit <br />Haul Rig <br />Cost/hr/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />DOT permit <br />Cost/fleet <br /> <br /> <br /> <br />-reveg equipment _ 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $113.67 $88.67 $0.00 <br />sheet 1 of 2